
Standard Steel Butt weld Pipe Fittings
RAYOUNG is a China steel pipe fittings manufacturer who offers a full range fittings of ASME B16.9, ASME B16.28, ASME B16.49, GOST 17375, GOST 30753-2001, GOST 17376, GOST 17378, GOST 17379, EN 10253 butt weld pipe elbow, pipe reducer, pipe tee, pipe cross, pipe bends, and pipe caps.
Ranges from material types, includes carbon steel butt weld fittings, alloy and stainless steel butt weld fittings.
RAYOUNG’s high quality products that have been approved by ISO 9001, GOST-R and CE.
Customized pipe fittings and flanges are also available.
Table Of Contents For This Page
It is not easy to introduce all aspects of butt weld pipe fittings, so we have prepared a lot of information on this page for you to delve into. To make sure you can find the information you want quickly, we have prepared this content directory that will jump to the corresponding location when you click on it.
General Applications For Steel Butt weld Pipe Fittings
Butt welding is used to connect pipes and fittings ends by the butt welding process. Also known as welded pipe fittings (buttweld fittings). It has ends in beveled or plain, material in carbon steel, alloy steel and stainless steel.
The result? A strong connection with the minimal distortion will keep your project running smoothly longer than anything else!
Instead of cutting and soldering the pipes, a buttweld fitting is fitted with another pipe that has been ground down on one end. This allows for easier access to both ends while still providing adequate protection against corrosion because there’s no open spot in between them where moisture can gather easily 3/8 inch diameter x 24 inches long.
Butt weld pipe fittings are one of the most popular connection types in pipeline systems. It has always been required in massive quantities in different industries, especially for the large diameter pipelines.
Butt-welded fittings are used to modify, separate, or stop the flow of fluids. These include waste treatment plants, oil processing, breweries, the chemical and petrochemical industries, cryogenic plants, paper and pulp production, gas treatment, and even nuclear power stations.
The choice of fittings varies according to the intended purpose.
‘Pipe Elbows’ are used to alter the pathway of a pipeline.
‘Pipe Reducers’ are needed to reduce or increase the size of the pipe bore size.
‘Pipe Tees’ or ‘Pipe Crosses’ are used to split the flow in the pipe multiple ways.
‘Pipe Caps’ are used if the pipeline needs to be closed off.
Chemical industry
wastewater-treatment industry
Marine & Shipbuilding industry
Power Generation industry
oil & gas industry
Buttweld pipe fittings can tolerate high pressures and elevated temperatures in harsh conditions. They are widely considered to be the most durable welding fixture, no matter what industry they are used in.
For any industries not listed, please feel free to contact us.
General Hot Selling Products
Hebei RAYOUNG Pipeline Technology Co., Ltd. mainly produces buttweld pipe fittings in the standards of ASME, EN, and GOST.

- Smooth surface
- Seamless material
- Hot-pushed technology
- Long warranty period
Sizes from1/4 inch to 24 inches are seamless, production technology is hot-pushed.
Sizes above 24 inches are welded, with1 or 2 welding lines.

- Factory price no middle man
- GOST 17375, 30753, 17376, 17378, 17379
- Shorter delivery time
- Longer warranty time
RAYOUNG GOST standard pipe fittings have been exported to Russia, Belarus, Uzbekistan, Kazakhstan, Ukraine, and other countries.

EN 10253 Buttweld Steel Pipe Fittings
- CE approved qualified fittings
- Nearly 30 years of production experience
- Cras ultricies mid ultricies
- Cras ultricie
Product details: Length of the backarc, bevel ends, surface treatment, package, marks…
Wanna dig deeper in steel pipe fittings?
Estimated Cost Analysis For Buttweld Pipe Fittings
Please note that the final cost depends on the customized service you require, the specifications of the raw materials used, the relevant national laws, and the distance of transportation. Take the example of booking a tall container of products:

Seamless pipe tees, OD=2", thickness=sch 40, the theoretical weight= 0.65kg, the weight limit of the container is 28 tons.
$41000
from the export port to the destination port
$4,300
Insurance cost; Customs clearance fee; Import tax; Transportation costs from the port to your warehouse
$1,000
The Process Flow & Duration Estimation
The whole process from inquiry to cargo arrival will take a long time, now we provide you with a reference time according to the regular process
Step 1: Quotation and negotiation (7-15 days)
We are always online 7 x 24 without any special circumstances. Your inquiry will be answered within 2 hours and you will receive a detailed quote for your inquiry within 12 hours.
Since 2020, due to the epidemic and international trade situation, the prices of steel raw materials in China fluctuate frequently and are on an overall upward trend. Therefore, if your purchase plan is real, we recommend you sign the contract and arrange the prepayment as soon as you agree with the final price with the producer.


Step 2: Sampling (4-10 days)
If necessary, we will provide you with free samples for quality testing. You only need to pay for the courier cost.
Some small-sized fittings are in stock, for DN 50 or more samples need to wait for about 3 days, usually, the courier will deliver the samples to you in 4-10 working days.

Step 3: Prepayment (within 7 day)
Regardless of the country, it usually takes 1-7 business days from the time you arrange the bank transfer to the payment arrives.

Step 4: Bulk Manufacturing (15-30 days)
After the advance payment arrives, the factory starts to prepare raw materials, quality inspection, and bulk manufacturing. It takes 15-30 days to complete a container of goods.

Step 5: Shipping (7-30 days)
After the goods have been produced, inspected, and packed, time needs to be reserved for booking and shipping.
Delivery – Loading – Discharging – Customs Declaration – Shipping – Customs Clearance – Unloading – Dispatch

Want to know how to compress lead times?
Contact us directly to get the right solution for your project. The more comprehensive the information you provide, the more accurate our quotations and delivery times are.
The Common Pitfalls When Purchasing
During the cooperation with more and more customers from different countries, we noted there are some pitfalls that often happen, so we collected the pitfalls together and wish to make your business easier.
Quotation validity,As prices fluctuate frequently. It is essential to negotiate prices in good time and to update them if an order has not been placed for more than a month.
Pricing Terms.
Under CIF contracts, the seller assumes responsibility for costs and liabilities until the shipment arrives at the destination, at which time the risk is transferred to the buyer.
Under FOB contracts, the buyer is responsible for shipping and other costs, as well as insurance as soon as the goods are loaded onto the vessel and during the voyage.
Under DDU contracts, the seller is responsible for ensuring goods arrive safely to a destination; the buyer is responsible for import duties.
Under DDP contracts, the seller must cover duties, import clearance, and any taxes.
In the contract, the delivery time commonly means the production time of your order. The time of the goods arrive your warehouse is aleo affected by the Vessel Schedule.
More advice is being updated……
A Brief Self-Nomination, Why Choose RAYOUNG?
Factory of RAYOUNG was founded in 1983 to produce hot-pushed elbows and casting flanges, then turn to more fittings and forged flanges. Now, we’ve grown into a major fittings &flange company in China with over $17000000 in annual sales. That’s right, you can rely on us!
The professional manufacturing capacity of RAYOUNG strongly guarantees high-quality products, competitive prices, and short delivery time.
Still doubtful? Here are other reasons why we're your best bet:
- 36-years experience in manufacturing and supplying carbon steel seamless and welded pipe fittings and forged flanges.
- We're ISO, CE and GOST-R-certified; we're 100% legit.
- More than 100 happy customers worldwide. We have made products for companies in Russia, Thailand, UAE, Oman, Nigeria, etc.
- We're expanding fast. We currently have 5+ production lines and 100,000 square feet of factory space ready to serve you.
- Qualified products. Experienced QC team and strict QC process to ensure your export quality.
- We're fast and responsive. Connect with us on our site and we'll get back to you within 2 hours.
- We have established partnerships with globally renowned oil companies such as ADNOC, NI0C, CNPC, and developed authorized distributors across multiple countries.
The FAQs About RAYOUNG Steel Pipe Fittings
Where is your factory?
Factory of RAYOUNG is in the base of Chinese pipe fittings, Yanshan county, Cangzhou City, Hebei Province. Contact us to get the visit brochure.
Which products do you mainly produce?
Carbon steel pipe fittings and flanges in the standard of ASME, GOST, EN, DIN, SANS, JIS, etc.
Do you manufacture all sizes in-house?
No, pipe fittings in size of DN200-DN720, medium and low pressure flanges in size of DN15-DN2000 are produced by ourselves, and the rest of the products are produced by brother factories.
What is your annual production?
The output is 1000 tons / month, almost export of 35-40 containers per month, annual output more than10000 tons.
How can I get your price list?
The rale price is based on the size, thickness, surfacetreatment, material, standard, quantity and destination. If you don't have a purchase plan, we can supply you a FOB price based on 1 container for reference.
Do you have distributors in my country?
We have stable distributors in Russia, Thailand, UAE, Nigeria, South Africa, Iran and other countries. If you can't import by yourself, we will be glad to introduce you to our customers.
What kind of payment method do you accept?
90% of our orders are paied in T/T USD, 30%-50% in advance, and the balance before shipment, or against the copy of BL. L/C, cash, Western Union are also acceptable.
What is the warranty time of your products?
The warranty period for regular carbon steel products is 1 year, and the normal use time is over 3 years. The warranty period for special products can reach more than 5 years.

